Find a service provider |  Customer Login


Call: 1-888-874-4779 or Contact us

Case Studies

Case Study: Geothermal Power Plant in California

The Operator of a geothermal power plant in California encountered a severe degradation in electricity output.

Case Study: Reactor Tubes Creep Damage

AcousticEye is called in to locate Creep (bulging) in the tubes of a big chemical plant facility.

Case Study: Inspection of a graphite condenser

Detecting a hole in a graphite condenser

Case Study: Assembly process QA for hole detection and welding analysis.

AcousticEye APR technology is implemented in the manufacturing and assembly process for quality assurance in Steam Generators.

Case Study: Inspection at a Nuclear Power Plant

Detecting wall loss defects in very unique configuration tubes at a nuclear power plant.

Case Study: National Electric Company

Emergency Maintenance inspection performed at a national power generation company in order to avoid serious shut down during prime user time.