A field demo was performed on a U-bundle at CPC workshop at Kaohsiung
The service provider was called to inspect boiler tubes for a Global Shipping Company in a parcel tanker on one of the ships docked at the terminal.
HVAC chillers are essential components in the manufacturing process of semi-conductors.
In November 2010, a refinery with 275,000 bbl/day-capacity performed a major shutdown in one of their facilities.
The Operator of a geothermal power plant in California encountered a severe leak in an air cooled heat exchanger.
AcousticEye was called in to locate creep damage (bulging) located in the reactor tubes at a big chemical plant facility.
AcousticEye APR technology is implemented in the manufacturing and assembly process for quality assurance in Steam Generators.
Detecting wall loss defects in very unique configuration of tubes at a nuclear power plant.
Emergency Maintenance inspection performed at a national power generation plant in order to shorten shutdown during peak load season.
Please fill in the form below for more information